Hub 07 Contracts and Risk

0 of 7 written
  1. 07.10 OFCI, CFCI, and OFOI as Risk Allocation soon
  2. 07.20 GMP Contract Mechanics soon
  3. 07.30 Liquidated Damages and Liability Caps soon
  4. 07.40 Data Center SLA and Performance Terms soon
  5. 07.50 OFCI Contract Administration soon
  6. 07.60 Contract Novation soon
  7. 07.70 Insurance: Builder's Risk, Transit, and Delay soon

A short lesson sequence. Work the notes in numbered order; each builds on the last.

Part II: The Craft. The commercial terms that allocate risk: who buys, who installs, who pays when things go wrong.

Assumes: Hubs 05 and 06. Contracts formalize sourced, costed deals — the commercial logic comes first.

Learning path

07.10 OFCI, CFCI, and OFOI as Risk Allocation

Builds on 03.10's mechanics: what actually moves with the split — vendor leverage, cash timing, schedule control, insurance coverage in transit and storage, and the warranty handoff. Why the industry is shifting toward owner-direct buying for long-lead equipment (lead-time control, fewer markup layers) — and what the owner inherits with that control, including liability for late or damaged delivery. Builds on: 03.10 (the mechanics), 05.10 (why owners take control).

07.20 GMP Contract Mechanics

How guaranteed-maximum-price contracts really work on data center builds: cost reimbursement plus a cap, shared-savings clauses, open-book accounting, the contractor's overrun risk — and the failure mode, where signing a GMP against an incomplete design produces 8-14% change orders versus 3-5% at a proper design freeze. Matching contract form to design maturity instead of using GMP as a substitute for scope definition. Builds on: 03.40 (the delivery models), 07.10 (the risk-allocation logic).

07.30 Liquidated Damages and Liability Caps

The enforcement layer: delay damages accruing daily past milestones, performance damages for capacity/PUE/availability shortfalls, overall liability caps (typically 30-50%), and why damages must genuinely pre-estimate the owner's loss to be collectible. What lenders demand in EPC structures — fixed dates, fixed prices, LDs for both delay and performance — and how owners and contractors negotiate fault allocation when delays are rarely one party's alone. Builds on: 07.20 (the GMP contract), 03.40 (EPC structures).

07.40 Data Center SLA and Performance Terms

The commercial terms that define what "working" means: uptime commitments and their link to Tier topology (Tier III ≈ 99.982%), service credits of 5-30% of monthly fees per incident capped at 50% of one month as sole remedy, and why Tier classifications are unenforceable until the SLA defines measurement, exclusions, and remedies. Extends to O&M agreements — reliability KPIs, response/resolution windows, deduction mechanics. Builds on: 01.30 (the Tier topology), 07.20 (the contract structure).

07.50 OFCI Contract Administration

Making OFCI work after signature: the OFCI tracker as the single source of truth, contract terms for delivery timelines, receipt and inspection obligations (open and inspect on delivery, not box-counting), storage and protection responsibilities, FOB shipping-point vs. destination liability. The warranty finger-pointing problem — manufacturer blames installation, contractor blames product, owner pays for the investigation — and how documentation discipline prevents it. Builds on: 07.10 (the split), 03.60 (FAT/SAT receipt).

07.60 Contract Novation

Moving a live contract from one party to another without breaking it: all-party consent, deeds of novation, and why "deemed" novation without paperwork transfers liabilities you didn't bargain for. Novation vs. assignment — the legal mechanics, applied in 10.20 to the procurement-transition use case. Builds on: 07.10-07.50 (the contracts being moved).

07.70 Insurance: Builder's Risk, Transit, and Delay

Who insures what under each procurement split: builder's risk during construction, transit and storage coverage for OFCI equipment (the owner's gear, the owner's risk), and delay-in-startup coverage. Why OFCI shifts insurance obligations to the owner — and what to verify before the first shipment leaves the factory. Builds on: 07.10 (the split determines who insures).

Key sources: Global Data Center Hub on EPC/O&M/SLA structures; JD Supra on cost accountability in construction disputes; Young Architect Academy on OFCI; Practical Law on novation.